Overlapping Regulatory Regimes

May 24th, 2022 by James Goudie KC

In R (Vanbrugh Court Residents Association) v London Borough of Lambeth (2022) EWHC 1207 (Admin) a judicial review challenge to a grant of planning permission fails. The permission was for a roof level extension to a four storey block of flats so as to provide sixteen additional residential units and five external lifts. Thornton J. summarises the legal frameworks on material considerations (paras 18-22), overlapping regulatory regimes (para 23), duty of sufficient inquiry (para 24), the Court’s review of Planning Officer Reports (para 25), and interpretation of planning policy (para 26).  A local planning authority is entitled to place reliance on the effective operation of other regulatory regimes, but must assess them sufficiently so as to be able to satisfy itself that the other regulatory regime is capable of regulating the relevant issues. The existence of the other regulatory regime is a material planning consideration, to be weighed in the balance. Thornton J. adds (para 39) that the existence of the building control regime was a material planning consideration, to be weighed in the balance. It was open to the Council to place reliance upon the effective operation of the regime in determining the planning application, provided it satisfied itself that the building control regime was capable of regulating the relevant issues.

Comments are closed.